SOLVING SHENZHEN’S TRANSIT PUZZLE

The construction of Shenzhen North Railway Station was the engineering equivalent of completing a giant jigsaw puzzle.

Description

When the city of Shenzhen announced plans to build “the best train station in Asia”, it clearly meant business. Predicted to serve more than 44 million passengers annually by 2020, Shenzhen North Railway Station is the new hub of South China’s high-speed train and passenger rail network. With its cantilevered roof structure and space-age façade, the station is an architectural statement reflecting the dynamism of an ambitiously expanding metropolis. But what’s inside is equally exciting. Completed in 2011, the station accommodates local and long-distance bus links, eleven platforms and twenty train lines, including the Guangzhou-Shenzhen high-speed train. Take the KONE elevator underground and you find three subway lines, one providing the first-ever seamless connection between Shenzhen and nearby Hong Kong. KONE was chosen to supply the elevators and help solve the people flow puzzle of this high-profile project. KONE experts analyzed the peak-hour traffic flows and proposed the optimum number of KONE high-capacity 1,350 kilogram elevators.

  • #Airport & Transit
  • #Asia
  • #Elevators
  • #Maintenance
  • #New equipment

Building facts

  • Completed: Train station 2011; Metro 2012
  • Size: 1,224,200 sqm
  • Height: 22.3 m
  • Floors: 5
  • Flow: 44,500,000 passengers annually
  • Architect: Zhang Shaomin
  • Building owner: Shenzhen Government
  • Developer: Shenzhen Metro Co., Ltd
  • Contractor: China Railway Engineering Corporation

KONE solutions

  • 51 KONE MonoSpace® elevators
  • KONE Care™ Maintenance Service
CHALLENGESSOLUTIONS
  • To analyze the massive traffic flows of the multi-level hub and deliver optimum solutions for convenient passenger routing
  • To accommodate numerous last-minute modifications and coordinate the project on a tight schedule, collaborating with other contractors
  • To deliver energy-efficient elevator solutions
  • Detailed people flow analysis and high-capacity elevators optimally positioned to channel vertical traffic between five floors
  • Close communication and coordination with the customer and other contractors
  • Elevators equipped with energy-efficient KONE EcoDisc motors

Share this page

WELCOME TO KONE!

Are you interested in KONE as a corporate business or a career opportunity?

Corporate site

Would you like to find out more about the solutions available in your area, including the local contact information, on your respective KONE website?

Your suggested website is

We couldn't determine a local website for you

Go to your suggested website